+86-18661938375        hlkwatertreatment@yeah.net
Home / Cases / Cases / 50TPD INTEGREATED SEWAGE TREATMENT PLANT ARRIVED IN IRAQ

50TPD INTEGREATED SEWAGE TREATMENT PLANT ARRIVED IN IRAQ

Views: 0     Author: Site Editor     Publish Time: 2021-10-05      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Date: 2022-10-5

Client: Mr.Simon

Country:Iraq


Raw Water: cheese production waste water

COD:500PPM;BOD 300PPM;TSS:300PPM;OIL:10PPM;PH:7.8

Final treated water: irrigation

COD:50PPM;BOD 20PPM;TSS:10PPM;OIL:5PPM;PH:8

Our client Mr.Simon has asked me to quote sewage treatment plant for campping area in Iraq. During the conversation with him, a few points of his thought would be considered by our design.


1, To ensure the treated water quality, we adopted AO+MBR method.


2, Water shortage: for water saving, the final treated water used for irrigation.


3, System less maintenance: we gave enough standing by components in case of replacement as the system located in remote area.


4, Power saving: PLC control with automatic monitoring with less manpower required.




QUICK LINKS

Copyright ©️ 2023 Qingdao Hailuoke Environmental Protection Equipment Co.,Ltd. Technology by Leadong. Sitemap.